Thursday, April 15, 2010
more updates
In the spring when you unpack the boat ,something always breaks, like the battery selector switch. Lucky I have a spare and while at it I also changed the blower circuit breaker switch, which never worked right after getting wet last year. The start of the mast step project is doing well. I do hope it works. see the old shipyard for pics. I also gave her a fresh bottom paint job with my last bit left over from last year. I'm impressed how long the paint lasts ,it doesn't dry out like most paints do so you can just add some thinner and all is fine again.
Friday, April 9, 2010
Things that are done

The following are now done for this year
1 the windows are in
2 all lines aft is complete
3 the anchor locks are in
4 the new cleats are also on
5 the sail track is in
6the Edison pedestal hold is also done
7 we have a new Bimini and Dodger to install.
8 there is a new rebuild kit for the head to install.
All because the weather has been great
Sunday, December 6, 2009
2010 upgrade plans
new life lines
fresh coat of bottom paint
a design to self step the mast
new all lines aft hardware
service all winches(disassemble without loosing parts)
new port and starboard bow windows, Brass
Rope work for rear entry
Main sails sent out to be serviced
Get the electronics running right
redo the inside finish trim
re varnish all the upper deck wood
Subscribe to:
Posts (Atom)